Work was completed over the Summer of 2019 on the refurbishing of the existing running track at Mission Middle School. The existing track was an asphalt track that was experiencing some cracking ans separation. The base track surface cracks were repaired and the track was overlaid with a new crumb rubber surfacing. The track at Lewis and Clark is the only full 400 meter track at the BPS middle schools so this track was surfaced to be the primary middle school competition track for the District. The installation of the rubber surfacing will also qualify for a partial rebate from the Nebraska Department of Environmental Quality for use of recyclable materials on the project.